The Croix d’Or and Madeleine buildings, constructed in 1902 and 1924, have undergone numerous transformations over their history, including the addition of a connecting building in two phases (1973 and 2000). These two buildings are today listed by the Commission for Monuments, Nature and Sites (CMNS) of the Canton of Geneva for their overall heritage value.

The load-bearing structures consist of stone masonry façades, within which the heterogeneous floor slabs rest on a steel frame and masonry walls. The foundation slab of the basement level lies below the groundwater table.

Due to the severely degraded condition of the structures, a full restoration is required to meet current standards. The foundations are reinforced using minijetting columns. Steel columns, beams, and girders are strengthened with welded steel plates. Thin reinforced-concrete slabs are reinforced with an additional layer of UHPC and punching reinforcement. Timber floors are converted into composite timber-concrete slabs. Stairwells are refurbished. The new layouts require underpinning works and the enlargement of the basement level using a sequenced minijetting column wall.

By 2026, the renovated buildings—meeting modern structural and functional standards—will be delivered to the client, enabling the continuation of commercial activities in the “Rues Basses”, Geneva’s downtown commercial district.

  • Owner

    Redevco GmbH, Düsseldorf, Germany

  • Architect

    CCHE, Geneva

  • Civil engineer

    INGPHI SA, Lausanne

  • Construction companies

    Belloni SA (Structural work)
    Alfer construction SA (Steel construction)
    Implenia SA (Special works)
    Ateliers Casaï SA (Timber frame)

  • Services performed

    31, 32, 33, 41, 51, 52

  • Technical features

    Listed heritage buildings, preservation of existing structures, structural refurbishment, seismic assessment, minijet columns, underpinning, steel structure reinforcement, UHPC, timber–concrete and steel–concrete composite slabs.

  • Construction period

    2018 - 2026

Project Team

  • Ouvrir

    Alexandre

    Wiedmer

    Civil engineer

    https://work.ingphi.ch/en/team/alexandre-wiedmer/

  • Ouvrir

    Antenor

    Taboada

    Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/antenor-taboada/

  • Ouvrir

    Bernard

    Adam

    Associate - Project Manager - Civil Engineer

    https://work.ingphi.ch/en/team/bernard-adam/

  • Ouvrir

    Fatima

    Moukhtari

    Project Manager - Geotechnical Engineer

    https://work.ingphi.ch/en/team/fatima-moukhtari/

  • Ouvrir

    Florent

    Iseni

    Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/florent-iseni/

  • Ouvrir

    Jonathan

    Duruz

    Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/jonathan-duruz/

  • Ouvrir

    Lirim

    Hasani

    BIM Modeler - Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/lirim-hasani/

  • Ouvrir

    Manuel

    Carreira

    Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/manuel-carreira/

  • Ouvrir

    Pierre

    De Groot

    Project Manager - Civil Engineer

    https://work.ingphi.ch/en/team/pierre-de-groot/

  • Ouvrir

    Quentin

    Cernigoi

    BIM Modeler - Civil Engineering Draftsman

    https://work.ingphi.ch/en/team/quentin-cernigoi/

BAC – Contemporary Art Building
Maison de l’enfance et de l’adolescence de Montétan